I. Introduction:
COGGS (Cyclists of Gitchee Gumee Shores) invites proposals for the rehabilitation, widening, and necessary water management for approximately 6500 feet of existing bike-optimized, machine-built single track. Builder will need to follow Specification 15 in the “Trail Specification Matrix”. This trail segment is vital as it will seamlessly connect with a newly constructed “Universally Accessible Trail” completed in the summer of 2024. The project will address persistent erosion and runoff issues affecting Knowlton Creek, a designated trout stream, by capping high-clay soil areas to improve drainage, reduce sedimentation, and enhance sustainability. Trail improvements will increase accessibility, providing a safe, high-quality experience for riders of all abilities.
II. Project Overview:
The project focuses on enhancing the existing single track to accommodate a diverse range of mountain bike riders. This trail plays a crucial role as it will link with a newly constructed, universally accessible trail, promoting inclusivity within the biking community. The completion of this loop will offer a cohesive and accessible biking experience for all riders, including those utilizing adaptive bikes.
III. Scope of Work:
The selected contractor will be tasked with: Rehabilitating and widening the existing single track. Capping high clay content soils and areas prone to erosion. Ensuring the trail adheres to universal accessibility standards. Incidental to the “TRAIL RE-CONSTRUCTION” unit bid item is uphill ditching necessary to divert water away and off of the trail tread. “TRAIL LIFT & TILT” in order to qualify as a billable unit differing from “TRAIL RE-CONSTRUCTION” the tread must be substantially raised at least 8” proud of the surrounding terrain so that water does not flow onto and down the trail.
Please find the full bid set below. Download a copy of both Bid Sheets and email completed bids to executivedirector@coggs.com